
- Project Name Kings Theatre
- Client Ambassador Theatre Group
- Category Ceiling Repair Job
- Duration 2 days
- Location Glasgow
Project Summary
Following roof failure, we were called out to repair water damage to a toilet ceiling. After re-tacking the ceiling, we taped, jointed and decorated.












