• Project Name London Theatre
  • Category Survey
  • Date February 2020
  • Location London

Project Summary

We were called to London to help with some issues the Surveyor was having gaining access to record the structural steelwork.

We arranged for an Refurbishment and Demolition Survey to be carried out and opened up areas to allow the Structural Engineer access.

At all times we had to be sympathetic towards the intricate decorative detailing of this listed building.

Following the survey, we re-instated everything back to how it was.